Mts Criterion 60 - Lifting and Moving Instructions Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 15
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
MTS Criterion™ Series 60
12
Moving the Integrated Operations Platform
Lifiting and Moving Instructions
Moving the Integrated Operations Platform
Unloading
Choose suitable slings according to the Integrated Operations Platform and crate
weight. Wrap the sling through the crate pallet and raise it.
Moving the Integrated Operations Platform to Its Final Location
To move the Integrated Operations Platform:
1. Unpack the Integrated Operations Platform.
2. Choose suitable chains according to the Integrated Operations Platform
weight.
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15

Commentaires sur ces manuels

Pas de commentaire