Mts SWIFT 45 GLP Sensor Manuel d'utilisateur Page 40

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 106
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 39
SWIFT
®
45 GLP Sensors
40
Road and Track Vehicles
Installation
C. Repeat Step 6A for the final torque.
7. Tighten the M20 mounting bolts.
A. Following the sequence shown in the previous figure, torque the eight
M20 bolts (1 through 8) to the value for the first increment shown in
the following table.
B. Repeat Step 7A for the second increment.
C. Repeat Step 7A for the final torque.
8. Refer to Step 4. Finish tightening the 32 hub adapter bolts.
A. Following the sequence shown in the previous figure, torque the 32
M12 bolts (1 through 32) to the value for the first increment shown in
the following table.
B. Repeat Step 8A for the second increment.
C. Repeat Step 8A for the final torque.
Note To minimize negative clamping effects, you must torque the bolts in the
sequence shown.
BOLT SIZE
TORQUE INCREMENT M12 M20
1st Increment 32.5 N·m (24 lbf·ft) 168.1 N·m (124 lbf·ft)
2nd Increment 65 N·m (48 lbf·ft) 336.2 N·m (248 lbf·ft)
Final Torque 97.6 N·m (72 lbf·ft) 501.6 N·m (370 lbf·ft)
Vue de la page 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 ... 105 106

Commentaires sur ces manuels

Pas de commentaire