Mts SWIFT 45 GLP Sensor Manuel d'utilisateur Page 73

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 106
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 72
SWIFT
®
45 GLP Sensors
Maintenance
73
Cables
Monthly Inspect all electrical cables monthly, or after every 160 hours of operation.
Always turn off the electrical power before you disconnect, repair, or replace a
cable.
1. Check the condition of the cables for cuts, exposed wires, or other types of
damage, loose connectors, and cracked or worn cable covers. Tighten any
loose connectors. Replace any cracked or worn cables.
2. Ensure that cable connectors are securely plugged into their respective
receptacles.
3. Ensure that all cables have appropriate strain relief devices installed.
4. Protect cables from being stepped on. In the test lab, elevate and cover all
cables to protect them from exposure to spilled hydraulic fluid.
5. Ensure that all cables are supported every 1.2 m (4 ft). Cables should also be
supported near a motion joint.
6. Check that path ways of moving cables are clear of obstructions. Prevent
cables from moving or rubbing against sharp corners.
Vue de la page 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 105 106

Commentaires sur ces manuels

Pas de commentaire